Crane-Specific Investigation
The lift plan, load, rigging, ground, and work sequence create the factual record.
A crane event cannot be evaluated from the equipment name alone. The type of crane, configuration, load, radius, rigging, ground support, assembly, signals, weather, work zone, and people directing the lift determine which records and physical evidence matter.
Crane incidents may involve a dropped or shifting load, collapse, overturn, contact, struck-by event, caught-between injury, electrical contact, assembly problem, or failure of rigging or another component. Each mechanism calls for different measurements, records, and technical review. The unchanged crane and rigging should be documented before repair, disassembly, return to service, or destructive testing where preservation is possible.
Workers' compensation may address a worker's medical and wage-loss benefits. A separate claim involving a crane owner, rental company, contractor, property owner, rigging supplier, manufacturer, or maintenance provider requires independent proof. The contract structure and actual control of the lift should be examined rather than inferred from job titles alone.